Data Centers

Malaysia – JHB1

Powering Ambition Enabling Digital Transformatio

Land cable connection
Submarine cable connection
Strategic partner
Establish and strengthen partnerships/connectivity
 

Data Center Location

NTP campus, on part of lot PTD 5224,
Nusajaya, Johor, Malaysia

Building information

Tier Lv:T3+
Floor area:38,500 m2
Number of floors: 2 above-ground two-story buildings
Load bearing: 15 kN/m2

Design Parameter

External: Dual 60MW (33kV)
IT power: 21.6~24MW
Single cabinet density: 8~25kW/ cabinet, customizable
Power architecture: DR 3+1 Customizable
Refrigeration system: Precision air conditioning and water-cooled chiller, can be customized

Malaysia – JHB2

Hyperscale Data Centers Continue To Be Intensively Cultivated

Release of AIGC Data center full stack solution
– Intelligent Power Module 3.0
– magnetic suspension phase change cooling system
– Integrated modular solution

Data Center Location

39KM from PTP port It is 42KM from 
downtown Sinsan 28KM from
Senai International Airport 60KM

Building information

Mains input: 2N
Firewood configuration: N+1
Construction area: 22500 ㎡
Number of floors: 3
Building mode: Steel structure
Water/diesel backup time 12/12 hours
Designed average annual PUE ≈1.33

Design Parameter

IT Capacity: 26.6MW
Single cabinet power: 21kW
Cooling system: maglev phase change + backplane wind wall
IT UPS redundancy configuration: DR/2N

Indonesia-JKT1

Advanced Data Center

Metta DC’s Jakarta data center is a state-of-the-art, 35MW facility located in the Jababeka Industrial Estate, West Java, featuring six data halls and 10,000 sqm of white space, capable of housing up to 3,000 racks​
 

Data Center Location

Bekasi Area (Outer Jakarta) – Jababeka Industrial

Building Facility

• 3 Storey building
• 10,000 sqm total IT Hall
• Building seismic damper (until 9RS)

Data Hall

• 500 racks per data hall
• Average rack density 5 kW
• Maximum high density 15kW
• Rack dimension: 48U, 600mmx1200mm

Mechanical & Electrical

• N+1 Generators Configuration
• N+1 Power Distribution
• N+1 UPS configurations

Case1

Phase 1: Delivering 132MW

IT Load: 351MW, DC Capacity: 800MW (2* 400MW, 2N Configuration)

Timeline:

case1_tl
Case2

MEP Delivery: 4-6 months per building with 35MW capacity

IT Load: 320MW, DC Capacity: 600MW (3* 200MW, DR Configuration)

Timeline: